Home / Construction Management / SYNCHRO | Case Studies

SYNCHRO | Case Studies

SYNCHRO Case Studies

Real SYNCHRO users, real success stories.

Featured User Story

Proicere Digital

MODERN NUCLEAR WASTE TREATMENT FACILITY PROJECT SET TO HOUSE WORLD’S LARGEST CIVIL STOCKPILE OF PLUTONIUM.

The Sellafield Retreatment Plant (SRP) is part of the United Kingdom’s Nuclear Decommissioning Authority’s (NDA) initiative to gradually transfer, repackage, and safely store 140 tons of separated plutonium for 100 years, playing a vital role in safeguarding public health, protecting the environment, and advancing scientific knowledge.

Modern Nuclear Waste Treatment Facility Project Set to House World’s Largest Civil Stockpile of Plutonium.

Browse Case Studies

SYNCHRO case sudy

Jacobs-Greenman-Pedersen Inc. JV

INNOVATIVE FLOOD RESILIENCE PROJECT IN THE HEART OF NEW YORK CITY

The Brooklyn Bridge Montgomery Coastal Resiliency project is a critical initiative designed to protect New York City from flooding and enhance the resiliency of communities at risk of storm surges. The project will serve as a benchmark for coastal resilience in the face of global warming and rising sea levels.

An aerial view of a city street reveals a SYNCHRO-designed modern bus stop at the center, nestled among tall buildings. Trees line the sidewalks as people walk by, illustrating urban vibrancy in this living case study of efficient public space integration.

PT Hutama Karya (Persero)

PT HUTAMA KARYA BUILDS SMARTER, SUSTAINABLE SUBSTATIONS IN JAKARTA

Jakarta Mass Rapid Transit is an ambitious project to expand public transport in the city, with phase 2A focusing on the northward expansion of the Red Line from Bundaran to Kota.

Aerial view of a large construction site with cranes, steel structures, and partially built buildings near a waterfront, perfectly illustrating the complexity and efficiency showcased in this SYNCHRO Case Study.

Laing O’Rourke

Builds a 52,888-seat Iconic Stadium Supporting Everton Football Club and Regeneration of North Liverpool

Laing O’Rourke implemented 4D dynamic digital construction delivery to meet stringent logistical and heritage requirements.

A modern train station platform with a SYNCHRO train arriving. People are waiting, including a person in a wheelchair. The platform has accessible features and information screens, reflecting the latest innovations seen in urban transportation case studies.

South Eastern Program Alliance (SEPA)

REMOVING 85 LEVEL CROSSINGS FOR SAFER TRAVEL AND REDUCTIONS IN ROADBLOCKS AND COLLISIONS

SYNCHRO helped teams visualize construction in 4D and cut development time to three months, minimizing traffic disruption. The 4D model enabled the team to develop construction staging plans 71.5% faster.

ECHOWATER Sat 1

Project Controls Cubed (PC3)

ADVANCING WASTEWATER TREATMENT TO HELP RELIEVE MULTIYEAR DROUGHT IN SACRAMENTO

Project Controls Cubed (PC3) upgrades the Sacramento Regional Wastewater Treatment Plant, providing safe and reliable treated water for recycled water use while saving USD 400 million in budget.

A construction site featuring a blue crane, scaffolding, and various machinery is bustling in Dublin City Centre; surrounding buildings and a small tree are visible, showcasing the progress of digital construction with 4D models.

John Sisk & Son

REVITALIZING DUBLIN CITY CENTRE WITH MODERN MIXED-USE BUILDING

Sisk Coordinates one of the largest retail and office development projects in Dublin City Centre, despite space limitations and many logistical challenges.

An architectural rendering shows a white arched pedestrian bridge over a river surrounded by trees, with a crane positioned nearby. Buildings and roads are visible in the background, illustrating solid support structures in place.

Solid Support

50% IN TIME SAVED WITH 4D SIMULATION OF BRIDGE CONSTRUCTION

Solid Support Animates Australia’s First Diagonal Arch Bridge Helping Win Bid for Construction Company.

Danish Road Directorate

Danish Road Directorate

THE AGE OF DIGITAL DELIVERY

Danish Road Directorate uses SYNCHRO 4D with their new Infrastructure Plan 2035, raising the level for BIM in road, rail, and bridge construction in Denmark.

Acciona

ACCIONA

MODERNIZING MELBOURNE’S RAIL INFRASTRUCTURE

ACCIONA Dramatically Reduces Staging Time and Drafting Requests To Deliver the Level Crossing Removal Program.

Skanska-Case-Study

SKANSKA

HIGH PROFILE M42 JUNCTION 6 SCHEME

Skanska Utilizes Virtual Construction Rehearsal to Ensure Seamless Bridge Installation on Busy Motorway.

Digital Construction Delivery Software

Plan, optimize, and track projects in a single environment to increase safety and reduce project risks.

SYNCHRO Role Based